# Material Planner (Electrical) at crusoe

- Company: crusoe
- What the company does: Crusoe provides next-gen AI infrastructure and cloud compute using an energy-first approach. Deploy AI workloads at scale with reliable performance and 24/7 support. Backed by Founders Fund, Felicis and Air Street.
- Company website: https://www.crusoe.ai
- Type: Startups (AI role)
- Level: Mid level
- Location: Arvada, CO - US
- Work setup: On-site
- Posted: 2026-08-21
- Apply by: 2026-10-19
- Apply: https://jobs.ashbyhq.com/crusoe/99fede61-450c-44cd-9dad-ca4fef925cfb?utm_source=1752vc&utm_medium=careers
- Page: https://www.1752.vc/careers/jobs/crusoe-material-planner-electrical/

## About the role

The Material Planner, Electrical is responsible for determining whether the production schedule is materially feasible for electrical components, including switchgear, PDC components, and specialized cable/wire. Working directly from the Master Production Schedule (MPS) and released Manufacturing Bill of Materials (MBOM), you will run MRP, maintain Clear-to-Build (CTB) status, manage shortages proactively, and own the day-to-day supplier forecast and commitment cadence. Found on 1752vc Careers, the job board for startup and VC roles.

Tags: Manufacturing (MFG)

Source: 1752vc Careers, https://www.1752.vc/careers/jobs/crusoe-material-planner-electrical/
