# Data Center Construction Site Foreman (Reno) at Lambda Labs

- Company: Lambda Labs
- What the company does: Train and scale AI on NVIDIA VR200 NVL 72, GB300 NVL 72, B300, B200, H200, H100, and and more GPUs. Launch on-demand instances or reserve a cluster. Get started.
- Company website: https://lambda.ai
- Type: Startups (AI role)
- Level: Mid level
- Location: Reno, NV - Data Center
- Work setup: On-site
- Pay: $188K to $250K base salary per year (USD)
- Posted: 2026-09-23
- Apply by: 2026-11-07
- Apply: https://jobs.ashbyhq.com/lambda/938d8192-b8e3-432f-b0cb-924755a0ce4d
- Page: https://www.1752.vc/careers/jobs/lambda-labs-data-center-construction-site-foreman-reno/

## About the role

As a Construction Onsite Foreman, you are Lambda’s eyes, ears, and hands in the field. You will hold daily on-site command of colocation white space fit-outs, high-density compute expansions, and infrastructure upgrades, working under the Data Center Implementation Manager and alongside the Data Center Implementation Project Manager to turn drawings and schedules into installed, energized, and accepted capacity.

## What they're looking for

- Proven record supervising construction, fit-out, or infrastructure installation work in data centers or comparable mission-critical facilities
- High school diploma or equivalent required. Completed trade apprenticeship, journeyman license, technical certification, or associate degree in a construction or engineering discipline strongly preferred
- 5+ years of construction field experience, including 2+ years in a foreman, lead, or superintendent capacity
- Direct experience with data center white space fit-out, critical facility construction, or comparable industrial and mission-critical installation work
- Working knowledge of electrical, mechanical, and low voltage systems and installation practices, including power distribution, cooling, containment, and cabling
- Ability to read and interpret construction drawings, specifications, submittals, and installation instructions, and to produce accurate redlines

Tags: Data Center Business
