# Data Center Construction Quality Assurance & Quality Control (QA/QC) at Oracle Cloud Infrastructure

- Company: Oracle Cloud Infrastructure
- What the company does: Oracle Corporation is an American multinational technology company headquartered in Austin, Texas. Backed by Envestors.
- Company website: https://oraclecloud.com
- Type: Startups
- Level: Mid level
- Location: NM, United States
- Work setup: On-site
- Posted: 2026-08-21
- Apply by: 2026-10-14
- Apply: https://eeho.fa.us2.oraclecloud.com/hcmUI/CandidateExperience/en/sites/CX_45001/job/333297
- Page: https://www.1752.vc/careers/jobs/oracle-cloud-infrastructure-data-center-construction-quality-assurance-and-quali/

## About the role

**This role is based in the El Paso, TX/Las Cruces, NM area and requires one to live in the area. Relocation assistance available. Only apply if you currently live in this area or are able to relocate permanently to the area. **

