# Lead Principal Data Center Construction Manager at Oracle Cloud Infrastructure

- Company: Oracle Cloud Infrastructure
- What the company does: Oracle Corporation is an American multinational technology company headquartered in Austin, Texas. Backed by Envestors.
- Company website: https://oraclecloud.com
- Type: Startups
- Level: Principal and up
- Location: United States
- Work setup: On-site
- Posted: 2026-11-02
- Apply by: 2026-12-17
- Apply: https://eeho.fa.us2.oraclecloud.com/hcmUI/CandidateExperience/en/sites/CX_45001/job/333345?utm_source=1752vc&utm_medium=careers
- Page: https://www.1752.vc/careers/jobs/oracle-cloud-infrastructure-lead-principal-data-center-construction-manager-2/

## About the role

We are seeking an experienced Data Center Construction Manager to provide expert oversight and technical leadership for the construction of data centers performed by colocation providers. This high-level individual contributor role is critical in ensuring that projects meet schedule, quality, and design requirements through hands-on expertise, strategic coordination, and independent execution. Primary focus will be on data center builds. Travel will be required for this role (about 50%). Found on 1752vc Careers, the job board for startup and VC roles.


Source: 1752vc Careers, https://www.1752.vc/careers/jobs/oracle-cloud-infrastructure-lead-principal-data-center-construction-manager-2/
