# Principal Data Center Construction Manager at Oracle Cloud Infrastructure

- Company: Oracle Cloud Infrastructure
- What the company does: Oracle Corporation is an American multinational technology company headquartered in Austin, Texas. Backed by Envestors.
- Company website: https://oraclecloud.com
- Type: Startups
- Level: Principal and up
- Location: Abilene, TX, United States
- Work setup: On-site
- Posted: 2026-09-11
- Apply by: 2026-10-26
- Apply: https://eeho.fa.us2.oraclecloud.com/hcmUI/CandidateExperience/en/sites/CX_45001/job/333261
- Page: https://www.1752.vc/careers/jobs/oracle-cloud-infrastructure-principal-data-center-construction-manager/

## About the role

Oracle Cloud Infrastructure (OCI) is seeking a Principal Data Center Construction Manager to support field execution for hyperscale AI data center construction in Shackelford, Texas. This role is responsible for supporting safe, predictable, and high-quality construction delivery across assigned buildings, systems, areas, or discipline scopes.

